Skip to content
TRUST CENTER

Evidence before claims.

This page states what is claimed, what is not claimed, and the exact state vocabulary used to decide the difference.

PRIVATE ARCHITECTURE PREVIEW · M1 IN PROGRESS
01

Claim boundaries

02

Project-state vocabulary

No earlier state substitutes for a later state. A plan is not a merge, a merge is not a ratification, and a ratification is not an active claim.

  1. 01DEFINED
  2. 02PLANNED
  3. 03CANDIDATE
  4. 04MERGED
  5. 05RATIFIED
  6. 06CLAIM ACTIVE
CapabilityCurrent stateClaim
Canonical record modelCANDIDATENOT ACTIVE
Append-only integrity chainCANDIDATENOT ACTIVE
Offline independent verifierPLANNEDNOT ACTIVE
Portable proof bundle formatPLANNEDNOT ACTIVE
Android durable encrypted-at-rest vaultDEFINEDNOT ACTIVE
SYGNET policy control planeDEFINEDNOT ACTIVE
03

Security model overview

Local-first by design

The intended runtime keeps evidence on operator-controlled hardware; no remote service is required by the design.

Separation of roles

Capture, approval and consent are distinct roles so that one compromised role does not silently produce approvals.

Evidence scope discipline

Anything outside the declared capture boundary is treated as unobserved, not as absent.

No secrets in this preview

This site is frontend-only. It holds no credentials, no backend endpoint and no external integration.

04

Source hierarchy

  1. 1

    Primary source document

    Official text published by the issuing body, referenced directly.

  2. 2

    Official secondary communication

    Issuer-published summaries, notices or procedural records.

  3. 3

    Editorial analysis

    Clearly labelled interpretation, never presented as source fact.

  4. 4

    Project state

    Declared SBBX repository or milestone state, labelled as project state.

05

Correction policy

  • · Corrections are published as amendments, not silent edits.
  • · Each corrected item carries a correction-history indicator.
  • · Analysis errors are separated from source errors in the correction note.
06

Responsible disclosure

PLACEHOLDER

Responsible disclosure placeholder. A published intake channel will be documented at ratified M1 completion. No disclosure endpoint is active in this preview.